OpenTunnel Designer Help

To Attach a Saved View Reference from the Project Explorer Dialog

  1. Open the Links tab of the Explorer dialog.
  2. Open the Links tab of the Project Explorer dialog.
  3. Drag the saved view to be referenced from the Views tab of the ProjectExplorer dialog to the open view.
  4. In the Reference Attachment Properties dialog, adjust settings as required.
  5. Click OK.